Availability: | |
---|---|
Quantity: | |
44mm or 50mm
yiande
73084000
Feature of Steel Toe Board
1. The Toe Board can be installed and dismantled without tools.
2. The baseboard (toe board) is L-shaped to block gaps between the struts and the panel.
3. The Toe Board is compatible with the revised Industrial Safety and Health Law that came into force on June 1, 2014, and the directives from the Labor Standards Bureau Industrial Safety and Health Department Director.
4. The Toe Board can be installed in the gaps between the framework and footboard.
5. The left and right fixtures fold outwards to allow stacked storage of the main body.
Q195 Pre-galvanized Scaffolding toe board | |||
![]() | Width*Height | Thickness | Length |
200 x 40mm | 1.0 - 2.0mm | 0.5-4.0M | |
210 x 45mm | |||
225 x 38mm | |||
230 x 63mm | |||
240 x 45mm | |||
250 x 40mm | |||
250 x 50mm | |||
300 x 50mm | |||
400 x 40mm | |||
420 x 45mm | |||
480 x 45mm | |||
500 x 50mm |
Production Flow
Packaging & Shipping
Feature of Steel Toe Board
1. The Toe Board can be installed and dismantled without tools.
2. The baseboard (toe board) is L-shaped to block gaps between the struts and the panel.
3. The Toe Board is compatible with the revised Industrial Safety and Health Law that came into force on June 1, 2014, and the directives from the Labor Standards Bureau Industrial Safety and Health Department Director.
4. The Toe Board can be installed in the gaps between the framework and footboard.
5. The left and right fixtures fold outwards to allow stacked storage of the main body.
Q195 Pre-galvanized Scaffolding toe board | |||
![]() | Width*Height | Thickness | Length |
200 x 40mm | 1.0 - 2.0mm | 0.5-4.0M | |
210 x 45mm | |||
225 x 38mm | |||
230 x 63mm | |||
240 x 45mm | |||
250 x 40mm | |||
250 x 50mm | |||
300 x 50mm | |||
400 x 40mm | |||
420 x 45mm | |||
480 x 45mm | |||
500 x 50mm |
Production Flow
Packaging & Shipping